Sign In | Join Free | My udpf.com
China Zhengzhou Hengyang Industrial Co., Ltd logo
Zhengzhou Hengyang Industrial Co., Ltd
Commit to recycle waste sources, making earth better.
Verified Supplier

5 Years

Home > Mineral Processing Plant >

2000t/D Complete Mineral Processing Plant Ore Pelletizing

Zhengzhou Hengyang Industrial Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

2000t/D Complete Mineral Processing Plant Ore Pelletizing

Brand Name : Hengyang

Model Number : F-0015

Certification : ISO9001

Place of Origin : China

MOQ : 1 Set

Payment Terms : T/T

Supply Ability : 350sets/month

Delivery Time : 35 days

Packaging Details : negociated

Capacity : 2000-10000T/D

Color : According to buyers requirement'

Order : made to order

Appplication : mineral ore

Condition : New

Contact Now

Complete Mineral Industrial Production Line Lead Recovery Production Line

Brief introduction about mineral ore beneficiation line:
The ore processing equipment composes of many equipments, such as jaw crusher, impact crusher, vibrating feeder, belt converyor, ball mill, spiral separator, mixer, rotary kiln,and so on. as to how many equipments needed for each model, it's mainly depended on your situation and your expect about the final product, such as the size of the stone, the grade of the coarse ore and your expect on the final product,etc.

Complete Mineral Industrial Production Line Lead Recovery Production Line

Our Advantages:

1. High efficiency
In crushing, it adopts traditional two-stage and a closed circuit system for ideal fineness. Besides, jaw crushers have large crushing capacity.
2. Saving energy
In grinding and classification, with characteristics of large processing capacity and small floor area, superfine lamination autogenous mill can save energy by more than 85%.
3. Good classifying effects
In classification, hydrocyclone and vibrating screen can enhance the classifying effects.
4. Environmental protection
It adopts the third generation tailings dry stacking technology, which can save energy by 60-80%. Furthermore, it can also protect the environment and build a base for green mine.


Process introduction:

After beneficiation, there are some residual water in ore concentration. So we have to carry on concentrate dehydration to meet the requirements of transportation and smelting.

2000t/D Complete Mineral Processing Plant Ore Pelletizing

500 TPD Ore Processing Line Equipment List for Your Reference

Equipment Size QTY (set) Power (kW) Remarks
Chute feeder 980×1240 1 7.5
Jaw crusher PE400×600 1 30 Cast steel rack
Jaw crusher PEX250×1000 2 37 Cast steel rack
Swaying feeder 600×600 1 2.2
Rotary ball mill Dia2.1×4.0 1 245
Spiral classifier FLG-2000 1 18.5
Magnetic separator CTB900×1800 1 4 2500gs
Magnetic separator CTB750×1800 2 3 1400~180gs

1000 TPD Ore Processing Line Equipment List for Your Reference

Equipment Size QTY (set) Power (kW) Remarks
Chute feeder 980×1240 1 7.5
Jaw crusher PE600×900 1 75 Cast steel rack
Fine jaw crusher PEX250×1200 2 37 Cast steel rack
Vibrating feeder DZ-5 2 0.75×2/set
Ball mill Dia2.7×3.6 1 475
Spiral classifier FLG-3000 1 30
Magnetic separator CTB-1024 1 5.5 2500gs
Magnetic separator CTB-1021 2 4/set 1400~1800gs

Product Tags:

2000T/D Complete Mineral Processing Plant

      

Lead Recovery Ore Pelletizing Plant

      

Ore Beneficiation Mineral Processing Plant

      
Best 2000t/D Complete Mineral Processing Plant Ore Pelletizing wholesale

2000t/D Complete Mineral Processing Plant Ore Pelletizing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhengzhou Hengyang Industrial Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)